| Project start: | 2016 |
| Status: | Completed |
| Project completion: | 2019 |
| Types of works: | Electrical installation |
| Construction | |
| Start-up |
The contract was signed on September 30, 2016, and almost 3.5 years later we report on the successful and full completion of the complex of construction, installation and commissioning works on the project “Reconstruction of 330 kV SS Novokakhovska” with replacement of 220/150/35 kV JSC with JSC 330/220/35 kV Starting complex №3 ».
The work on the integration of the elements of the relay protection and control system into the ASC TP substation has been completed. ASK TP substation was put into trial operation.
A new 330/220/35 kV autotransformer was put into operation with a 220 kV overhead line connected to a new 220 kV OSG
The dismantling of decommissioned 150 and 220 kV equipment and relevant building structures is nearing completion
The works on integration of the elements of the relay protection and control system into the ASC TP substation are being completed
Complete replacement of 330 and 150 kV OSG power equipment was performed. The equipment was put into operation, including a new relay protection and control system, which is integrated into the substation.
Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.