330 kV SS “Novokakhovska”

Details
Project start: 2016
Status: Completed
Project completion: 2019
Types of works: Electrical installation
Construction
Start-up

December 2019

or use keyboard

The contract was signed on September 30, 2016, and almost 3.5 years later we report on the successful and full completion of the complex of construction, installation and commissioning works on the project “Reconstruction of 330 kV SS Novokakhovska” with replacement of 220/150/35 kV JSC with JSC 330/220/35 kV Starting complex №3 ».

The work on the integration of the elements of the relay protection and control system into the ASC TP substation has been completed. ASK TP substation was put into trial operation.

October 2019

or use keyboard

A new 330/220/35 kV autotransformer was put into operation with a 220 kV overhead line connected to a new 220 kV OSG

The dismantling of decommissioned 150 and 220 kV equipment and relevant building structures is nearing completion

The works on integration of the elements of the relay protection and control system into the ASC TP substation are being completed

Complete replacement of 330 and 150 kV OSG power equipment was performed. The equipment was put into operation, including a new relay protection and control system, which is integrated into the substation.

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form