loading...

About us. Kyiv
Energy Construction
Company

Founded: 2004
field of activity: energy construction

Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

We have built energy objects since 2004. We are proud to have joined to the development of the Ukraine’s energy system and continue to work for our country.

We have significant experience in projects financed by international organizations including the Word Bank, European Investment Bank, European Bank of Reconstruction and  Development and KfW Bankengruppe.

Our strategy is constant development and improvement to gain a competitive position in the market of energy and industrial construction using the latest technologies.

Company structure

The Company is proud of its friendly and experienced team. At present, the Company employs more than 550 people.

"Kyiv Energy Construction Company" LLC has multidivisional structure distributed across about 50 divisions to complete complex energy objects in the full cycle. The main production capacities are concentrated in:

"Kyiv Energy Construction Company" LLC
Electrical installation complex No. 1
Heat and electrical-installation complex No. 2
Construction and installation complex No. 3
Commissioning division
Comprehensive Design Bureau

Our history

2004
2006
2006
2011
2013
2015
2017
2020
Foundation of the company

The key area of the Company’s activities was performance of works related to installation of switchgear equipment, cable power lines and overhead power lines of 0.4-110/330 kV electrical networks, electrical supply to buildings and facilities, and also performance of design and general construction works.

Foundation of subsidiaries

KECC-1, KECC-2 and KECC-3 were founded on the basis of KECC LLC in accordance with their lines of activities.

Number of employees has increased tenfold during all these years.

Projects involving the laying of cable lines 110 kV in Kyiv

Laying cable lines SS "Polytechnichna" - SS "Vokzalna". Laying cable lines 100 kV SS "Tsentr" - "Vokzalnya". Reconstruction of cable lines 100 kV SS "Zhovtneva" - SS "Polytechnichna"

Construction of SS "Olympiyska"

SS "Olimpiiska" was designed to provide stable power supply for the main stadium of Euro 2012 which was scheduled to host the final match of the European football championship in Kyiv.

Relay protection and automation for 750 kV substations

There were performed works on reconstruction and replacement of relay protection and automation devices due to replacement of 330-750 kV existing air circuit breakers with SF6 ones at seven 750 kV substations of consolidated power system of Ukraine on the following feeders: 750 kV SS “Zakhidnoukrainska”, 750 kV SS “Pivdennodonbaska”, 750 kV SS “Vinnytska”, 750 kV SS “Zaporizhska”, 750 kV substation “Dniprovska”, 750 kV SS “Donbaska”, 750 kV SS “Pivnichnoukrainska”

Construction of SS 110/10 kV "Berkovetska"

Scope of construction, electrical-installation and commissioning works on construction of a new electrical substation 110/10 kV "Berkovetska" and its connection to the existing 110 kV OHL including arrangement of combined 110 kV OHL-CL and facility commissioning.

Contract for the construction of SS "Kreminska"

"KECC" LLC won the contract for the construction of SS "Kreminska" in Lugansk region. The tender procedures were carried out from December 27, 2016 to May 10, 2017.

"KECC" LLC finished the construction of the most up-to-date substation in the history of independent Ukraine - 500 kV SS "Kreminska"

500 kV SS "Kreminska" is the first new substation of such voltage class in the history of modern Ukraine. The project included many unique solutions for this country.

Certificates

Completed projects
SS 500 kV "Kreminska"

New construction of 500 kV SS “Kreminska” with diversions of OTL 500 kV Donbasska – Donska and OTL 220 kV Kreminska - Yuvileina, Lugansk region

Read more...
Dnistrovska PSPP

Construction works of the second line of Dnistrovska PSPP which includes storage pump No.4.

Read more...
Kaniv HPP

Unit № 4. Reconstruction. Electrical part of Kaniv HPP branch of Ukrhydroenergo PJSC

Read more...
330 kV SS “Hirnycha”

Complex works on technical re-equipment of 330 kV SS “Hirnycha” with replacement of ATDTsTN autotransformer 250000/330/150/35 kV (АТ-1) with the new one

Read more...
330 kV SS “Novokakhovska”

"Reconstruction of 330 kV SS “Novokakhovska”, including replacement of АТ 220/150/35 kV with АT 330/220/35 kV. Startup complex No.3"

Read more...
110/10 kV SS "Olympiiska"

SS "Olimpiiska" was designed to provide stable power supply for the main stadium of Euro 2012 which was scheduled to host the final match of the European football championship in Kyiv.

Read more...
750 kV SS “Vinnytska”

750 kV SS “Vinnytska”. Reconstruction 750 kV SWYD at 750 kV SS “Vinnytska”, shunting reactor's bay ShR-750 "Zakhidnoukrainska"

Read more...
750 kV SS “Kyivska"

Expansion works were performed in the operating substation.

Read more...
330 kV SS "Rivne"

We commissioned ATDTN autotransformer 200000/330/110-У1 in 330 kV SS "Rivne"

Read more...
750 kV SS “Zaporizhska"

750 kV SS “Zaporizhska" is a key object of south-east part of Ukraine's JPS, which supplies with power and provides energy to industry and domestic consumers from Zaporizhzhia NPP - the largest nuclear power station in Europe.

Read more...
330 kV SS "Lozova"

Administratively 330 kV SS "Lozova" is located in Novonadezhdyne village Blyzniuky district Kharkiv region but belongs to the Pivnichna PS NPC "Ukrenergo". Technical re-equipment is carried out for the operating energy object.

Read more...
330 kV SS "Melitopolska"

Reconstruction project of 330 kV SS "Melitopolska". Reconstruction of substation for connection of 330 kV OHL Zaporizhzhia wind farm.

Read more...
110/35/10 kV SS "Mykhailivka"

110/35/10 kV SS "Mykhailivka" - Reconstruction of substation for connection of two solar power plants. SPP Mykhailivska - 15,8 MW - is located in Odesa region.

Read more...
Our specialists laid thousands kilometers of electrical and heating networks and also carried out important and significant projects for Ukraine.
We have built energy objects since 2004. We are proud to have joined to the development of the Ukraine’s energy system and continue to work for our country.

References

or use keyboard

The works were organised and carried out in accordance with the relevant quality control system and within the approved project schedule. Dniprovska PS

browse pdf

It is a highly qualified company which ensures quality and timeliness of work performance in full compliance with the customer's requirements, project documentation, building regulations and standards. NPC "Ukrenergo"

browse pdf

"KECC"LLC has experience, engineering staff and resources. We highly recommended this company as a contractor of similar works. Pivdenna PS

browse pdf

Qualification of "KECC" LLC guarantees timely and prompt solutions without disrupting the production process and deadlines. Tsentralna PS

browse pdf

Optimal engineering solutions with the use of modern technologies, trained and qualified stuff. NPC "Ukrenergo"

browse pdf

The customer's requests were taken into account as much as possible in performing of the works, thus ensuring the quality and timing of design works. Kyivenergo JSC

browse pdf

We consider "Kyiv Energy Construction Company" LLC to be an experienced partner and a highly qualified company. NPC "Ukrenergo"

browse pdf
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form