The agreement No.945К/2019 dated December 6, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of JSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)
The agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”).
Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”)
Project start: | 2018 |
Project status: | In process |
Project completion: |
Types of works: | Electrical installation |
Installation | |
Construction |
According to the Agreement dated October 26, 2020 the following works havebeen performed in a full scope:
1. Anticorrosion protection of process equipment and pipelines of under-turbine premise of HPU No. 17, 18.
2. Architectural and construction works on walls painting of under-turbine premise of HPU No. 17, 18.
3. Installation of fire doors in PWS premise and cable cellar of 6,3kV indoor switchgear.
4. Installation of 6,3kV indoor switchgear ventilation in Unit No.5.
5. Installation of power supply equipment to systems of Unit No.5:
– OPI,
– drainage,
– PWS,
– regulating system,
– 6,3kV metal clad switchgear,
– excitation system,
– generator circuit breakers.
The following works are ongoing:
1. Construction works on indoor finishing (ornamental finishing of columns) of 6,3kV indoor switchgear premise of Unit No. 5.
2. Laying of cable and wire products in all premises (6,3kV indoor switchgear, OPI, PWS, etc.) of Unit No.5.
3. Architectural and construction works on walls painting of over-turbine premise of HPU No.18.
4. Installation of PWS premise ventilation in Unit No.5.
5. Installation of PWS, OPI premises lighting.
6. Commissioning works on PWS, drainage and OPI systems.
According to the Agreement dated August 31, 2018 works on installation of regulating system of HPU No.17-20 have been performed in full scope.
Works on installation of 110kV disconnectors and 110kV current transformers in Unit No.5 are ongoing.
The Agreement No.945К/2019 dated December 06, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the Agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)
The Agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”)
The following works have been currently performed at Unit No.5 in full scope:
Works are ongoing at Unit No.5:
Under the Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”), the following works are ongoing at Unit No.5:
The agreement No.945К/2019 dated December 6, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of JSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)
The works on the arrangement of fire-prevention cable penetrations in all premises of Unit No.4 were performed in full scope and successfully handed over to the representative of the independent fire safety inspection and the Kaniv HPP Fire Safety Commission, as confirmed by the signed deed.
The agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit. Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”)
The following works have been currently performed at Unit No.5 in full scope:
Works are ongoing at Unit No.5:
The first shipment of electrical equipment was performed in January.
Under the Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”), the following works are ongoing at Unit No.5:
– installation of bays of 6,3 kV metal-clad switchgear;
– installation of the excitation system of the hydropower units (HPU) 17-20 (cabinets and transformers);
– arrangement of foundations for 110kV disconnectors;
– arrangement of embedded parts for equipment in premise of 6,3 kV indoor switchgear;
– installation of cabinets’ metal structure of 6,3 kV generator circuit breakers of HPU No.17- HPU No.20;
– installation of 6,3kV current and voltage transformers of HPU No.17- HPU No.20 in premise of main bus duct leads and 6,3 kV indoor switchgear of unit No.5.
– installation of 6,3kV disconnectors of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear of unit No.5;
– installation of 6,3kV bus duct of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear;
– installation of aluminium bus arrangement and argon welding works for connection of bus duct to 6.3kV equipment (current transformers, voltage transformers, 6.3kV circuit breakers) of HPU No.17- HPU No.20 in premise of main bus duct leads and 6,3kV indoor switchgear of unit No.5;
– installation of terminal-block cabinets of 6,3kV current and voltage transformers.
– on installation of cable and wire products.
Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.
01013, 4A Promyslova Str.
General enquires
General enquires
We will get back to you soon