Kaniv HPP

Деталізація

The agreement No.945К/2019 dated December 6, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of JSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)

The agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”).

Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”)

Project start: 2018
Project status: In process
Project completion:
Types of works: Electrical installation
Installation
Construction

August 2021

or use keyboard
According to the Agreement dated October 26, 2020 the following works have been performed:
– Anticorrosion protection of process equipment and pipelines of under-turbine premise of HPU No.17, 18;
– Architectural and construction works on walls painting of under-turbine premise of HPU No. 17, 18;
– Finishing works in under-turbine premise of HPU No. 17, 18;
– Installation of exhaust ventilation for capsules of HPU No. 17, 18;
– Installation of lighting in the premises of indoor switchgear and the corridors of main bushings of Unit No.5.
– Arrangement of polymer floor covering in the premise of 6,3kV indoor switchgear of Unit No.5.
– Commissioning works on systems of process water supply (PWS), drainage, oil-pressure installation (OPI), metering and disconnectors’ interlocking.The following works are in progress:
– Installation of lighting in PWS and OPI premises.
– Commissioning works on systems of indoor switchgear and OPI ventilation, lighting in the premises of indoor switchgear and the corridors of main bushings of Unit No.5.According to the Agreement dated 31, 2018:
– Works on installation of 110 kV current transformers of Unit No.5 have been performed in a full scope.
– Works on installation of 110 kV disconnectors of Unit No.5 are ongoing.

June 2021

or use keyboard

According to the Agreement dated October 26, 2020 the following works havebeen performed in a full scope:

1. Anticorrosion protection of process equipment and pipelines of under-turbine premise of HPU No. 17, 18.
2. Architectural and construction works on walls painting of under-turbine premise of HPU No. 17, 18.
3. Installation of fire doors in PWS premise and cable cellar of 6,3kV indoor switchgear.
4. Installation of 6,3kV indoor switchgear ventilation in Unit No.5.
5. Installation of power supply equipment to systems of Unit No.5:
–  OPI,
–  drainage,
–  PWS,
–  regulating system,
–  6,3kV metal clad switchgear,
–  excitation system,
–   generator circuit breakers.

The following works are ongoing:

1. Construction works on indoor finishing (ornamental finishing of columns) of 6,3kV indoor switchgear premise of Unit No. 5.
2. Laying of cable and wire products in all premises (6,3kV indoor switchgear, OPI, PWS, etc.) of Unit No.5.
3. Architectural and construction works on walls painting of over-turbine premise of HPU No.18.
4. Installation of PWS premise ventilation in Unit No.5.
5. Installation of PWS, OPI premises lighting.
6.  Commissioning works on PWS, drainage and OPI systems.

According to the Agreement dated August 31, 2018 works on installation of regulating system of HPU No.17-20 have been performed in full scope.

Works on installation of 110kV disconnectors and 110kV current transformers in Unit No.5 are ongoing.

April 2021

or use keyboard

The Agreement No.945К/2019 dated December 06, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the Agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)

 The Agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”)

The following works have been currently performed at Unit No.5 in full scope:

  • Construction works on indoor finishing (walls painting, counter ceiling) of 6,3kV indoor switchgear premise.
  • Construction works on indoor finishing (plastering, walls painting) of PWS (process water supply) premise.
  • All cabinet equipment was shipped for the period February – March.
  • All cabinet equipment in 6,3kV indoor switchgear premise has been installed. 

 

Works are ongoing at Unit No.5:

  • Construction works on indoor finishing (laying the skirting boards along the windows) of 6,3kV indoor switchgear premise.
  • Laying of cable and wire products in all premises (6,3kV indoor switchgear, OPI (oil-pressure installation) and PWS, etc.).
  • Architectural and construction works on walls painting in under-turbine premise of HPU No.17.
  • Works have been started on the installation of 6,3kV indoor switchgear ventilation.

Under the Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”), the following works are ongoing at Unit No.5:

  1. The works have been performed in full scope:
  • installation of bays of 6,3 kV metal-clad switchgear;
  • installation of the excitation system of the hydropower units (HPU) 17-20 (cabinets and transformers);
  • installation of cabinets’ metal structure of 6,3 kV generator circuit breakers of HPU No.17- HPU No.20;
  • installation of 6,3kV current and voltage transformers of HPU No.17- HPU No.20 in premise of main bushings and 6,3 kV indoor switchgear of unit No.5;
  • installation of 6,3kV bus duct of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear;
  • installation of generator circuit breakers of HPU No.17- HPU No.20;
  • installation of terminal-block cabinets of 6,3kV current and voltage transformers;
  • installation of 6,3kV disconnectors of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear of unit No.5;
  1. Installation works are ongoing:
  • on termination of cable and wire products.

 

February 2021

or use keyboard

The agreement No.945К/2019 dated December 6, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of JSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)

The works on the arrangement of fire-prevention cable penetrations in all premises of Unit No.4 were performed in full scope and successfully handed over to the representative of the independent fire safety inspection and the Kaniv HPP Fire Safety Commission, as confirmed by the signed deed.

 The agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”)

The following works have been currently performed at Unit No.5 in full scope:

  1. Architectural and construction works on arrangement of ventilation slots for ventilation of 6,3kV indoor switchgear premise.
  2. Installation of fireproof wall of new ventilation room in premise of PWS (process water supply).

Works are ongoing at Unit No.5:

  1. Construction works on indoor finishing (walls painting, counter ceiling) of 6,3kV indoor switchgear premise.
  2. Dismantling of old ventilation equipment in premises of OPI (oil-pressure installation) and PWS.
  3. Architectural and construction works on arrangement of ventilation slots for ventilation premises of OPI and PWS.

The first shipment of electrical equipment was performed in January.

Under the Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”), the following works are ongoing at Unit No.5:

  1. The works have been performed in full scope:

– installation of bays of 6,3 kV metal-clad switchgear;

– installation of the excitation system of the hydropower units (HPU) 17-20 (cabinets and transformers);

– arrangement of foundations for 110kV disconnectors;

– arrangement of embedded parts for equipment in premise of 6,3 kV indoor switchgear;

– installation of cabinets’ metal structure of 6,3 kV generator circuit breakers of HPU No.17- HPU No.20;

–  installation of 6,3kV current and voltage transformers of HPU No.17- HPU No.20 in premise of main bus duct leads and 6,3 kV indoor switchgear of unit No.5.

  1. Installation works are ongoing:

– installation of 6,3kV disconnectors of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear of unit No.5;

– installation of 6,3kV bus duct of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear;

– installation of aluminium bus arrangement and argon welding works for connection of bus duct to 6.3kV equipment (current transformers, voltage transformers, 6.3kV circuit breakers) of HPU No.17- HPU No.20 in premise of main bus duct leads and 6,3kV indoor switchgear of unit No.5;

– installation of terminal-block cabinets of 6,3kV current and voltage transformers.

  1. Works are starting:

– on installation of cable and wire products.

October 2020

or use keyboard

August 2020

or use keyboard

June 2020

or use keyboard

April 2020

or use keyboard

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form