Updated. Gas piston cogeneration plant with a capacity of 4.5 MW

Деталізація

As of September 2025, three cogeneration gas piston plants with a total capacity of 4.5 MW (1.5 MW each) have been installed at the facility “New Construction. Gas Piston Cogeneration Plant”.

Year of start of work:

2025

Status of work:

Completed

Date of completion:

2025

Type of work:

Equipment supply

Electrical installation work

Complex of design works

Equipment installation

Construction work

2025

or use keyboard
  • Construction works are fully completed;

 

  • Installation and commissioning works for the installation of electrical equipment are fully completed;

 

  • Installation and commissioning works for the installation of a 10 kV cable line for power delivery are fully completed;

 

  • Installation and commissioning works for the installation of the external and internal gas supply system are fully completed;

 

As of today, all work has been completed.

The cogeneration plant has been put into operation and is generating electricity.

 

Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form