Production report about works performed for Dnistrovska PSPP during August – September 2021

Production report about works performed by LLC “KECC” for Dnistrovska PSPP during August – September 2021
According to the Agreement No. 01-10/2017 dated May 10, 2018 “Building works on the construction of the second stage  of Dnistrovska PSPP consisting of the hydroelectric unit No.4 of the branch “Directorate of Dnistrovska PSPP Construction” of PJSC “Ukrhydroenergo” the following works have been
performed:1.  Works have been completed in a full scope:
–   on the installation of lighting for the hydroelectric unit compartment No.4;
–   all electrical equipment was installed; all power cable for power supply of technological equipment and all secondary connections of the control system in hydroelectric unit compartment No. 4, which were necessary for the start
of the hydroelectric unit No. 4, were laid and connected.2. Construction and installation works are ongoing:
–   on the installation of machine hall lighting;
–   on the installation of control and power cable lines of ventilation equipment in hydroelectric unit compartment No. 4, technological premise,
PSPP building;
– on the installation of the external grounding loop at the transformer outdoor arrangement site;
– on the installation of external lightning of the technological site, perimeter security lighting.

or use keyboard

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form