LLC "KEBK" in the period from March 2025 to May 2025, according to the concluded agreements with PJSC "Ukrhydroenergo",
performed a complex of dismantling works on the 154 kV GRP and 154 kV overhead line damaged as a result of the armed aggression of the Russian Federation at one of the hydroelectric power plants, namely:
The extremely complex dismantling of the 154 kV overhead line span above the lower reaches of the Dniprovska HPP-2 and above the Dniprovska HPP-2 switchgear building between the 154 kV overhead line support and the 154 kV GRP portal with a total length of 300 m was carried out.
The dismantling of 154 kV equipment was carried out:
154 kV circuit breakers,
154 kV disconnectors,
154 kV arresters,
154 kV current transformers,
Dismantling of cable and wire products and cabinet equipment of VRP-154kV was completed.
Dismantling of the 154 kV portal was completed.
Dismantling of metal structures for 154 kV equipment was completed.