loading...

Updated. Production report of the complex of design and construction works at one of the Ukrainian nuclear power plants

In accordance with the Agreement concluded between LLC "KEBK" and JSC "NAEK "Energoatom" for the performance of the work "Complex of design and construction works on the 750 kV GRP with transfer to a voltage of 420 kV" at one of the NPPs of Ukraine, LLC "KEBK" performs work on the 750 kV GRP, namely:

– Design work has been completed on the installation of a 330/110/35 kV AC at the 330 kV substation of one of the Ukrainian NPPs to power the 35/10/6 substation and the prospective construction of a 110 kV AC to the 110/35/10 substation.

 

– Work is underway to create a comprehensive NPP telemechanics system with a system for the operational blocking of disconnectors, remote control and technological video surveillance.

 

– Work is underway to replace the VRP-750 kV air circuit breaker with a GL318 SF6 gas-insulated type.

 

– Work is underway to technically re-equip the 35/10/6 kV substation.

 

Check out other news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form