loading...

Production report for Dniprovska HPP – December 2021

Agreement No.161K/2021 dated March 30, 2021 “(DK 021:2015 code 45310000-3 Electrical installation works) Replacement of electrical protective devices of GT-1 unit of branch Dniprovska HPP of PJSC “Ukrhydroenergo”
During this period the following works were performed:
1. Installation of power equipment:
– current transformers GTDSO 20 Gr / 31 (manufactured by RITZ) on the
existing 13.8 kV busduct,
– current-limiting fuses (manufactured by Cooper Bussman) in the primary
circuits of voltage transformers.
2. Laying and connection of cable and wire products.
3. Replacement of equipment of electrical protective devices of GT-1 unit:
– reinstallation of electrical protective devices of GT-1 unit in the
current panel,
– installation of microprocessor terminals (Micom P122 manufactured by
Schneider Electric, Micom P343, Micom P643, Micom P141, Micom P991
manufactured by GE and REG670_1.2 manufactured by ABB)
4. Commissioning works on the replacement of electrical protective devices of
GT-1 unit.
or use keyboard

Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form