Production report March 2025 – September 2025

From March 2025 to September 2025, LLC "KEBK" performed, in accordance with the Subcontract Agreement concluded with PrJSC "Ukrhydroenergo", a complex of installation works at one of the hydroelectric power plants

“Construction of a complex underground structure to protect the main electrical equipment of a branch of one of the hydroelectric power plants”, namely:

Cable metal structures and the internal grounding circuit in the cable tunnel KL-154kV L10, L11 have been installed.

The external grounding circuit has been installed along the cable tunnel KL-154kV L10, L11.