From March 2025 to September 2025, LLC "KEBK" performed, in accordance with the Subcontract Agreement concluded with PrJSC "Ukrhydroenergo", a complex of installation works at one of the hydroelectric power plants
“Construction of a complex underground structure to protect the main electrical equipment of a branch of one of the hydroelectric power plants”, namely:
Cable metal structures and the internal grounding circuit in the cable tunnel KL-154kV L10, L11 have been installed.
The external grounding circuit has been installed along the cable tunnel KL-154kV L10, L11.