Production report of a complex of design and construction works at one of the Ukrainian nuclear power plants
Production report of a complex of design and construction works at one of the Ukrainian nuclear power plants
In accordance with the Agreement concluded between LLC "KEBK" and JSC "NAEK "Energoatom" for the performance of the "Complex of design and construction works on the 750 kV GRP with transfer to a voltage of 420 kV" at one of the NPPs of Ukraine, LLC "KEBK" performs work on the 750 kV GRP, namely:
Design work is underway to install a 330/110/35 kV AC for the 330 kV AC substation of one of the Ukrainian NPPs to power the 35/10/6 substation and the prospective construction of a 110 kV AC line to the 110/35/10 substation.
Work has been completed on replacing the air circuit breakers B-40, B-42 on the 750 kV GRP with SF6 type GL318.
Work has been completed on replacing the DZ, DT assemblies, DC and AC switchboards, and outdoor luminaires on the 750 kV GRP.
Work is underway to create a comprehensive NPP telemechanics system with a system for the operational blocking of disconnectors, remote control, and technological video surveillance.
Work has been completed on the construction of cable channels on the 750 kV GRP.