Works have been performed in a full scope:
– on the installation of 330 kV T4 unit transformer. T4 transformer was
commissioned and valtage was applied;
– on the installation of lighting for the technology block (basement).
All electrical equipment was installed and all power cables for power supply
of technological equipment were connected. All secondery connections of the
control system in hydroelectric unit compartment No.4, which were necessary
for the start of the hydroelectric unit No.4, were laid and connected.