Production report about works performed for Dnistrovska PSPP

Production report about works performed for Dnistrovska PSPP as part of the project "Building works on the construction of the second stage of Dnistrovska PSPP consisting of the hydroelectric unit No.4".

Works have been performed  in a full scope:
– on the installation of 330 kV T4 unit transformer. T4 transformer was
commissioned and valtage was applied;
– on the installation of lighting for the technology block (basement).

All electrical equipment was installed and all power cables for power supply
of technological equipment were connected. All secondery connections of the
control system in hydroelectric unit compartment No.4, which were necessary
for the start of the hydroelectric unit No.4, were laid and connected.

or use keyboard

Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form