Production report about works performed for Kaniv HPP – August 2021

Production report about works performed by Kyiv Energy Construction Company for Kaniv HPP during July-August 2021
According to the Agreement dated October 26, 2020 the following works have been performed:
– Anticorrosion protection of process equipment and pipelines of under-turbine premise of HPU No.17, 18;
– Architectural and construction works on walls painting of under-turbine premise of HPU No. 17, 18;
– Finishing works in under-turbine premise of HPU No. 17, 18;
– Installation of exhaust ventilation for capsules of HPU No. 17, 18;
– Installation of lighting in the premises of indoor switchgear and the corridors of main bushings of Unit No.5.
– Arrangement of polymer floor covering in the premise of 6,3kV indoor switchgear of Unit No.5.
– Commissioning works on systems of process water supply (PWS), drainage, oil-pressure installation (OPI), metering and disconnectors’ interlocking.

The following works are in progress:

– Installation of lighting in PWS and OPI premises.
– Commissioning works on systems of indoor switchgear and OPI ventilation, lighting in the premises of indoor switchgear and the corridors of main bushings of Unit No.5.

According to the Agreement dated 31, 2018:

– Works on installation of 110 kV current transformers of Unit No.5 have been performed in a full scope.
– Works on installation of 110 kV disconnectors of Unit No.5 are ongoing.
or use keyboard

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Ознайомтеся з іншими новинами

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form