Production report about works performed for Kaniv HPP during March – April 2021

Production report about works performed by LLC “KECC” for Kaniv HPP during March 2021 – April 2021

The Agreement No.945К/2019 dated December 06, 2019 “Unit No.4. Reconstruction. The electrical part of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”) and the Agreement No.229К/2020 dated March 27, 2020 “Unit No.4. Reconstruction.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo” (the Customer – PJSC “Ukrhydroenergo”)

 The Agreement No.747К/2020 dated October 26, 2020. “DK 021:2015 code 45310000-3 Electrical installation works (Unit No.5. Rehabilitation of the unit.  Electrical installation and commissioning works of Kaniv HPP, branch of PJSC “Ukrhydroenergo”) (the Customer – PJSC “Ukrhydroenergo”)

The following works have been currently performed at Unit No.5 in full scope:

  • Construction works on indoor finishing (walls painting, counter ceiling) of 6,3kV indoor switchgear premise.
  • Construction works on indoor finishing (plastering, walls painting) of PWS (process water supply) premise.
  • All cabinet equipment was shipped for the period February – March.
  • All cabinet equipment in 6,3kV indoor switchgear premise has been installed. 

 

Works are ongoing at Unit No.5:

  • Construction works on indoor finishing (laying the skirting boards along the windows) of 6,3kV indoor switchgear premise.
  • Laying of cable and wire products in all premises (6,3kV indoor switchgear, OPI (oil-pressure installation) and PWS, etc.).
  • Architectural and construction works on walls painting in under-turbine premise of HPU No.17.
  • Works have been started on the installation of 6,3kV indoor switchgear ventilation.

Under the Contract No.15-1406/K dated August 31, 2018 “Rehabilitation of two units (No.4, 5) of Kaniv HPP (8 auxiliary systems of hydropower units for hydropower turbines with station numbers: 13, 14, 15, 16, 17, 18, 19, 20)” (the Customer – Consortium “RPA “Ukrgidroenergobud”), the following works are ongoing at Unit No.5:

  1. The works have been performed in full scope:
  • installation of bays of 6,3 kV metal-clad switchgear;
  • installation of the excitation system of the hydropower units (HPU) 17-20 (cabinets and transformers);
  • installation of cabinets’ metal structure of 6,3 kV generator circuit breakers of HPU No.17- HPU No.20;
  • installation of 6,3kV current and voltage transformers of HPU No.17- HPU No.20 in premise of main bushings and 6,3 kV indoor switchgear of unit No.5;
  • installation of 6,3kV bus duct of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear;
  • installation of generator circuit breakers of HPU No.17- HPU No.20;
  • installation of terminal-block cabinets of 6,3kV current and voltage transformers;
  • installation of 6,3kV disconnectors of HPU No.17- HPU No.20 in premise of 6,3 kV indoor switchgear of unit No.5;
  1. Installation works are ongoing:
  • on termination of cable and wire products.

 

or use keyboard

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form