Rehabilitation of 750 kV SS “Zaporizka” – production report for December 2021

Report about works performed for project “Rehabilitation of 750 kV, 330 kV outdoor switchgears, 150; 35; 15,75 kV equipment and auxiliaries at 750 kV SS “Zaporizka”
  • Works on the installation of bushings, attachable equipment and the full set of oil filling operations, including all necessary tests of PST3 phase B, C, are completed. Works on the installation of attachable equipment and oil filling of AT3 phase C are being carried out.
  • Works on the installation and bus arrangement of new power high-voltage equipment in AT3 connection bay to 750 kV outdoor switchgear are completed.
  • Works on the installation and connection of power and control cables are being performed.
  • The installation of equipment in auxiliary building 2, valve switch chamber building 5 and the arrangement of fire water supply networks is completed.
  • Construction of oil receiver for AT3 and PST3 is nearing completion.
  • Works on the installation of 15, 75 kV busducts and connection to phases AT3 and PST3 are being performed.
    Works on the replacement of the existing high-voltage power equipment at 330 kV outdoor switchgear, 750 kV outdoor switchgear (VT of second busbar
    section) and auxiliary system equipment, including 6 kV metal-clad switchgear, are being performed.
  • The existing trunk cable ducts are being repaired and the existing gantry structures of 750 kV outdoor switchgear are being covered with anticorrosion
    materials.
or use keyboard

Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form