Production report for Zaporizhzhia Nuclear Power Station

Kyiv Energy Construction Company performs works for Zaporizhzhia Nuclear Power Station
  • According to the Contract No.0704/2020 dated April 07, 2020, the works on replacement of SB auxiliary packaged transformer substation (KTPVP SB), normal operating system of the turbine compartment, normal operating system of the reactor compartment have been completed at power generator unit No.5.
  • According to the Contract No.2001/2020 dated January 20, 2020, the works on replacement of DC board (1SB, 2SB, 3SB, 3B-1, 3B-2, KOS) have been performed at power generator unit No.6.
  • According to the Contract No.2505/2021 dated May 25, 2021, the works on replacement of SB auxiliary packaged transformer substation (KTPVP SB) have been suspended at power generator unit No.6. The works on replacement of 1SB and 2SB auxiliary packaged transformer substations (KTPVP 1SB and 2SB) have been currently performed.

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form