Equipment delivery required for Contract implementation is ongoing and the following construction and installation works are in progress:
– dismantling works at 750 kV outdoor switchgear;
– arrangement of foundations for 750 kV and 330 kV outdoor switchgears equipment;
– assembly and installation of gantry structures of 750 kV and 330 kV outdoor switchgears;
– arrangement of foundations and oil receiving pits of AT3 and PST3 phases;
– installation of 330 kV cables;
– replacement of 6/0,4 kV unitized auxiliary transformer substation and accumulator battery at 330 kV building of relay panels.