Rehabilitation of 750 kV SS “Zaporizka” – production report for April 2021

Project “Rehabilitation of 750 kV, 330 kV outdoor switchgears, 150; 35; 15,75 kV equipment and auxiliaries at 750 kV SS “Zaporizka”

Equipment delivery required for Contract implementation is ongoing and the following construction and installation works are in progress:

– dismantling works at 750 kV outdoor switchgear;
– arrangement of foundations for 750 kV and 330 kV outdoor switchgears equipment;
– assembly and installation of gantry structures of 750 kV and 330 kV outdoor switchgears;
– arrangement of foundations and oil receiving pits of AT3 and PST3 phases;
– installation of 330 kV cables;
– replacement of 6/0,4 kV unitized auxiliary transformer substation and accumulator battery at 330 kV building of relay panels.

or use keyboard

Kyiv Energy Construction Company Kyiv Energy Construction Company is a leading Ukrainian company providing engineering, procurement and construction (EPC) services for large-scale energy and industrial objects.

Our news

all news
or use keyboard
Contact us
all contacts
Kyiv, Ukraine

01013, 4A Promyslova Str.

(044) 545-71-24

General enquires

mail@kebk.com.ua

General enquires

browse map
You can contact us directly
open the contact form